Problem/Needs: To resolve leakage issues with roof valleys and tiles.
Solution: To re-roof the whole property adding an extra row of tiles to proved a minimum lap of 100mm. The job was completed in three stages. Rear elevations were stripped and completed followed by the front elevation. The side elevation, the largest with just over 900 tiles was the final stage. Over 2000 tiles were fitted in total.
Customer testimonial: "Our roof was leaking into the house in several places and was badly in need of a complete overhaul. John came out and assessed what was needed and spent time looking in to the underlying causes of the problem and suggesting the solutions available to us."
"John organised every aspect of the job, (ordering skips, scaffolding, timber, tiles and tidying up around the property) and kept us informed every day of how the job was progressing and what the next stages would be. John also ensured that the house was watertight every evening before leaving."
"John has a great attention to detail and believes that if you are going to do a job then it should be done correctly. The standard of the work carried out was first class and we would have no hesitation in using John again or highly recommending him to others."
Problem/Need: The original layout was poor. The kitchen layout was cluttered in one half of the room leading to a dinning room built from the original flat roof washhouse, which was cold and damp (single brick construction).
Solution: Demolish the existing washhouse and build a double extension. Downstairs the new building would provide additional space in the lounge forming an open plan kitchen/living area. Upstairs the extension provided a third bedroom.